top of page

Viessmann Manisa Isı Teknolojileri

Schneider EBO Building Automation system upgrade project. With this project, we helped client control Lighting and HVAC infrastructure.
Energy Monitoring system installation and usage analysis reports were provided .

2017012408521769_edited_edited.jpg

Ege Profil

Trigeneration system integration with existing Schneider Electric Building Management System.
Process revisions covering additional panel commissioning and field equipments installations.
Energy Monitoring System project and solutions.

about__img_edited_edited.jpg

Afghanistan NATO Headquarters Hospital

Building Management System installation and commissioning. Fire Alarm, Emergency Lighting, KNX lighting, HVAC Automation, Access and Intrusion Detection Systems, Energy Monitoring Systems.

Modern Bridge

WILO Pompa

Building Management System upgrade. Fire Alarm, LON Lighting, HVAC Automation, Access Control Systems, Energy Monitoring Systems.

wilo_pompa_fabrikas%C4%B1_edited.jpg

Bergama Devlet Hastanesi

Building Management System upgrade.

HVAC Automation, Surgery Room revisions, Hygenic Air Handling Units scenario revisions.

Communication infrastructure upgrade.

Periodic Maintenance

project_1_2.jpg

Schneider Electric Manisa Plant

Building Management System installation and upgrade.

HVAC Automation, VRF system integration, Lighting Control, Meeting Room Control, Production Line Radiant Heater System Control, Skylight Control.

Communication infrastructure upgrade.

Periodic Maintenance

Resim2.png

Nikki Beach Hotel

Building Management System installation and upgrade.

HVAC Automation, VRF system integration, Lighting Control.

Communication infrastructure upgrade.

Periodic Maintenance

nikki-beach.png

+90 232 520 2131 / +90 533 340 0466

Kazımdirik, Sanayi Cd. No:31/528, 35100 Bornova/İzmir, Turkey

©2019 by 7KR Consulting.

bottom of page